U.S. Environmental Protection Agency (EPA) began oversight of a $20 million dredge-and-cap project along the Lower Passaic River in Lyndhurst, New Jersey. The work will remove approximately 20,000 cubic yards of contaminated sediment from a short stretch of river adjacent to Riverside County Park. On August 7, GSWA Executive Director Sally Rubin attended a press conference intended to mark the start of dredging and introduce the project timeline to media representatives and the general public.
A long legacy of industrial pollution has rendered the Lower Passaic unswimmable, unfishable, and unlivable by most standards. In fact, in 1984, the overwhelming presence of hazardous substances in and below the water led the EPA to list 17 miles of the
river—from Dundee Dam near Garfield to Newark Bay—as part of the Diamond Alkali Superfund site.
The site takes its name from the now-defunct Diamond Shamrock Chemical Company (aka Diamond Alkali). As a major manufacturer of the chemical defoliant Agent Orange in the 1950s and 1960s, the corporation’s old Lister Avenue plant is now understood to be the predominant source of PCBs, dioxin, mercury, and other toxins afflicting the Lower Passaic.
For decades, cleanup of the contaminated river bottom has been mired down by innumerable feasibility and impact studies conducted by federal and state government agencies; as well as an unremitting, seven-year lawsuit. Filed by the New Jersey Department of Environmental Protection (NJDEP), the suit sought damages against 70 corporations deemed responsible for causing the pollution. Most of those corporations, including the oft-mentioned Occidental Chemical Corporation, are successors to the original Diamond Shamrock concern which was broken up, sold, and resold over the course of many years.
With the majority of impact studies concluded or wrapping up and the NJDEP lawsuit settled for $130 million in the state’s favor this past June, remediation is finally starting.
The project now underway at River Mile 10.9—RM 10.9 in common parlance—was not designed to address all 17 miles of the designated Superfund site. In truth, the intervention only covers a 5.6-acre area of severe contamination located offshore west of Riverside County Park. Nevertheless, Judith Enck, regional administrator for EPA Region 2, interprets activity at RM 10.9 as a positive sign of progress to come.
In a prepared statement released at the August 7 press conference Enck stated, “This cleanup removes some of the worst contamination in the Passaic River while the EPA continues to develop long-term cleanup plans for a 17-mile stretch of the Lower Passaic River...” An NJ.com report from the same event portrayed the Administrator’s hopeful outlook: “When you clean up urban waterways, people flock to the river,” Enck said. “It’s a tremendous opportunity for recreation and economic growth.”
The Lower Passaic River Study Area Cooperating Parties Group (CPG) recently released a statement announcing a timeline for work at RM 10.9. Equipment barges were to move into the vicinity of Riverside Park by the end of July, and dredging was to be completed by the end of September. However, a number of drawbridge failures along the downstream river corridor delayed the initial staging. Assuming the project recovers lost time, site capping—which involves the placement of an engineered stone barrier over the area of sediment removal—will begin in October and will conclude by December 31.
New Jersey will cover the $20 million price tag associated with RM 10.9 by dipping into the $130 million fund secured by NJDEP’s lawsuit. Although all of that settlement money has been earmarked for cleanup of the Lower Passaic, the Christie Administration—in a bid to balance the state budget—is pushing to reallocate at least $40 million of it into the state’s General Fund.
Speaking at the August 7 press conference, NJDEP Commissioner Bob Martin explained that the substantial reallocation would be used to pay back the state for earlier environmental investigations and intervention planning his agency conducted on the Lower Passaic. According to The Observer Online, Martin clarified his position stating that, “Before EPA got involved, the state did a lot of research to understand the magnitude of the problem with the river…”
NJDEP’s argument in favor of retroactive remuneration to the General Fund does not sit well with many. Congressman Bill Pascrell from New Jersey’s 9th District is one of those opposed to the idea. In a letter to Governor Christie dated August 6, 2013, he wrote, “….it is essential that all funding recovered from the responsible parties be put toward the remediation and environmental restoration of the Passaic River, and not diverted to alternate programs.”
Congressman Pascrell’s view echoes those of others throughout New Jersey who see the governor’s move as a scheme to pad the state’s budget at the expense of Passaic River communities. From this perspective, a clear distinction is made between the fuzzy logic of collecting a reimbursement for past exploratory exercises, and the inevitable need to pay the bills coming due for current, effective, shovel-in-the-ground remediation projects. For those who have waited much of their lives to see even a single concrete step taken toward river restoration, there is nothing to contest. Funds from NJDEP’s settlement must be used to alleviate the present threat and real pain of Passaic River pollution, and not redistributed under the pretense of refunding the government for work that has already been bought and paid for.
The poet and author Maya Angelou famously wrote that, "When we cast our bread upon the waters, we can presume that someone downstream whose face we will never know will benefit from our action, as we who are downstream from another will profit from that grantor’s gift." The communities of the Great Swamp Watershed have put tremendous effort into ensuring that the water passing through their custody on its way to Newark Bay remains clean and accessible to all. It is a given that those efforts have not been entirely successful, neither have they been wholly altruistic. Nevertheless, the principle of Angelou’s statement stands. The Passaic River begins with fishable, swimmable, and livable water. There is no valid principle or reasoning available to deny or delay the same for those living beyond its headwaters.
As protectors and advocates for waters that eventually find their way into the Lower Passaic, the Great Swamp Watershed Association lauds the progress made with the initiation of the dredge-and-cap program at RM 10.9. We also encourage all parties involved to look forward, instead of dwelling on past travails. Maintain your established momentum and commit all available resources and earmarks to the continuation of viable, effectual environmental remediation and restoration. Action is the best and only way to stretch the gift of cleaner water from the Great Swamp all the way to Newark Bay. And the sooner it is done, the sooner all of us in New Jersey may profit from a swimmable, fishable, and livable Passaic River.
Showing posts with label Sally Rubin. Show all posts
Showing posts with label Sally Rubin. Show all posts
Tuesday, October 1, 2013
Friday, May 24, 2013
Photo Contest Focuses In On Preservation Success Story in Great Swamp
Great Swamp Watershed Association will host first public event at 113-acre Primrose Farm on June 8.
Morris County boasts a brand new destination for those who love the outdoors.
Primrose Farm, a 113-acre tract of wetlands, fields, and forest in Harding Township, was once slated to become a 13-lot residential subdivision. After years of advocacy work by a coalition of non-profit and community partners, and the application of more than $9 million in municipal, county, and state funding, the property was successfully preserved as open space in December 2012. Now, under the auspices of its current owners at Harding Land Trust, the site will remain wild—providing vital habitat for endangered species like the Indiana bat, and a large area of porous land capable of recharging local groundwater supplies and the nearby Passaic River.
Primrose Farm is also open to the public for hiking, horseback riding, cross-country skiing, and other outdoor recreational activities.
The first organized public use of the site will take place on June 8, 2013, when the Great Swamp Watershed Association holds The Essence of Primrose, a special photo contest aimed at capturing the quintessential spirit of the newly preserved property.
Photographers of all ages and skill levels are invited to visit Primrose Farm any time between 10:00 a.m. June 8, and 10:00 a.m. June 9 in search of one photograph that they think best represents “the essence” of this diverse and beautiful landscape. Naturalists and professional photographers will be on hand between 10:00 a.m. and 2:00 p.m. on June 8 to help contestants tour the property and provide photography tips.
Following the photography period, contestants will have 7 days to sort and process their work before submitting a single photo for contest consideration. The deadline for submission is 10 a.m. on Sunday, June 16, 2013.
A jury consisting of professional photographers, naturalists, and others selected by the Great Swamp Watershed Association will judge each work and announce winners in three different age group categories on June 25, 2013.
Winning photographers will receive a special prize from Mpix.com. Winning photographs will be professionally printed by Madison PhotoPlus (Madison, NJ), framed by The Image Maker (Mendham, NJ), and publicly exhibited for one month at Somerset County Park Commission’s Environmental Education Center in Basking Ridge.
The Great Swamp Watershed Association contributed $200,000 to the purchase of Primrose Farm through New Jersey’s Green Acres program, and recently engaged a group of volunteers to build the first access trail onto the property (see photo). The organization will continue to assist the Harding Land Trust with future maintenance projects.
Groups contributing to the initial Primrose Farm preservation effort included the Great Swamp Watershed Association, the Harding Land Trust, the Trust for Public Land, the Harding Open Space Trust, the Morris County Open Space Trust Fund, and the Morris County Municipal Utilities Association.
For more information about the photo contest (including a complete schedule of events, rules, and photo submission guidelines) please visit GreatSwamp.org online or call 973-538-3500 x22. To be eligible to compete, all photographers must check in with the Great Swamp Watershed Association at Primrose Farm—located at approximately 15 Brook Drive, South, Harding, NJ—between 10:00 a.m. and 2:00 p.m. on Saturday, June 8.
Pre-registration is strongly encouraged. Visit GreatSwamp.org for a registration form. Registration is free; however, voluntary donations to the Great Swamp Watershed Association are gratefully accepted.
![]() |
| Great Swamp Watershed Association board members and staff hike Harding's newly preserved Primrose Farm property, January 2013. |
Primrose Farm, a 113-acre tract of wetlands, fields, and forest in Harding Township, was once slated to become a 13-lot residential subdivision. After years of advocacy work by a coalition of non-profit and community partners, and the application of more than $9 million in municipal, county, and state funding, the property was successfully preserved as open space in December 2012. Now, under the auspices of its current owners at Harding Land Trust, the site will remain wild—providing vital habitat for endangered species like the Indiana bat, and a large area of porous land capable of recharging local groundwater supplies and the nearby Passaic River.
Primrose Farm is also open to the public for hiking, horseback riding, cross-country skiing, and other outdoor recreational activities.
The first organized public use of the site will take place on June 8, 2013, when the Great Swamp Watershed Association holds The Essence of Primrose, a special photo contest aimed at capturing the quintessential spirit of the newly preserved property.
Photographers of all ages and skill levels are invited to visit Primrose Farm any time between 10:00 a.m. June 8, and 10:00 a.m. June 9 in search of one photograph that they think best represents “the essence” of this diverse and beautiful landscape. Naturalists and professional photographers will be on hand between 10:00 a.m. and 2:00 p.m. on June 8 to help contestants tour the property and provide photography tips.
Following the photography period, contestants will have 7 days to sort and process their work before submitting a single photo for contest consideration. The deadline for submission is 10 a.m. on Sunday, June 16, 2013.
A jury consisting of professional photographers, naturalists, and others selected by the Great Swamp Watershed Association will judge each work and announce winners in three different age group categories on June 25, 2013.
Winning photographers will receive a special prize from Mpix.com. Winning photographs will be professionally printed by Madison PhotoPlus (Madison, NJ), framed by The Image Maker (Mendham, NJ), and publicly exhibited for one month at Somerset County Park Commission’s Environmental Education Center in Basking Ridge.
The Great Swamp Watershed Association contributed $200,000 to the purchase of Primrose Farm through New Jersey’s Green Acres program, and recently engaged a group of volunteers to build the first access trail onto the property (see photo). The organization will continue to assist the Harding Land Trust with future maintenance projects.
Groups contributing to the initial Primrose Farm preservation effort included the Great Swamp Watershed Association, the Harding Land Trust, the Trust for Public Land, the Harding Open Space Trust, the Morris County Open Space Trust Fund, and the Morris County Municipal Utilities Association.
For more information about the photo contest (including a complete schedule of events, rules, and photo submission guidelines) please visit GreatSwamp.org online or call 973-538-3500 x22. To be eligible to compete, all photographers must check in with the Great Swamp Watershed Association at Primrose Farm—located at approximately 15 Brook Drive, South, Harding, NJ—between 10:00 a.m. and 2:00 p.m. on Saturday, June 8.
Pre-registration is strongly encouraged. Visit GreatSwamp.org for a registration form. Registration is free; however, voluntary donations to the Great Swamp Watershed Association are gratefully accepted.
Subscribe to:
Posts (Atom)



